Case Study 1: Gap Analysis for Troubleshooting and Operational Improvement of Exisiting Assets

Challenge Faced

  • Client wanted to resolve operating issues

  • Client wanted to increase plant capacity to meet nameplate capacity

  • Client wanted to improve process efficincy 

Case Study 2: NGL Recovery Debottlenecking & Capacity Enhancement

Value Delivered

  • Evaluate exisisting process design basis, process configuration, feed charactristics and products specifications 

  • Evaluate operating issues

  • Identify operational excellence to analysis the major unit operations perfromance in normal and upset conditions 

  • Identify areas for reliability, process improvment, operational improvment, process efficiancy, and recommendations

  • Identify opportunities potential improvments

  • Identify exisitng equipment capabilities and limitations

  • Identify potential optimization oppertunities

  • Identify any quick wins​

Challenge Faced

  • Operating issues in amine, mole sieve dehydration, condensate stabilizer, and demethanizer units

  • Client wanted to increase plant capacity above nameplate capacity

Value Delivered 

  • Increased plant capacity from 250 to 400 MMscfd (60% increase to the existing nameplate capacity) with $0.80/scf

  • Debottlenecked operating issues of existing process units

Case Study 3: Operation Excellence for NGL Fractionation 

Case Study 4: Change of Operation Mode for a NGL Recovery Plant

Challenge Faced

  • High NGL feed quality variation

  • Client wanted:

  • to increase further throughput

  • to save energy

  • to handle various feedstock impurities

  • to reduce production cost

Challenge Faced

  • Client wanted to increase the gas plant performance (more profit)

  • Client wanted to save energy:

  • ​No ethane demand

  • Deep ethane recovery system

Value Delivered 

  • Increased NGL fractionation throughput and efficiency

  • Minimized equipment downtime

  • Minimized operating cost (Processing fee)

Value Delivered 

  • Changed the mode of operation successfully with on-spec residue gas and NGL

  • Resolved the CO2 freezing in top of the demethanizer

  • Reduced the refrigeration system load

Case Study 5: Operational Improvement for a NGL Recovery Plant

Challenge Faced

  • Client wanted to increase the NGL facility performance (more profit)

  • Client wanted to save energy

  • Client wanted to further throughput

  • Operating issues at pretreatment units (AGRU and mole sieve dehydration)

Value Delivered 

  • Increased NGL plant throughput and efficiency

  • Identified and debottlenecked pretreatment operating issues, feeding on-spec stream to liquidation

  • Resolved the CO2 freezing through cold boxes

  • Reduced the refrigeration system load